{"id":6,"date":"2014-01-07T11:13:21","date_gmt":"2014-01-07T16:13:21","guid":{"rendered":"https:\/\/portfolio-perspectives.planview.com\/?p=2349"},"modified":"2017-12-14T15:13:47","modified_gmt":"2017-12-14T21:13:47","slug":"tips-better-project-estimates","status":"publish","type":"post","link":"https:\/\/blog.planview.com\/tips-better-project-estimates\/","title":{"rendered":"Tips 6-10 for Better Project Estimates"},"content":{"rendered":"<p>In my blog post, <a title=\"10 Tips for Better Project Estimates\" href=\"https:\/\/portfolio-perspectives.planview.com\/better-project-estimates-jerry-manas\/\">10 Tips for Better Project Estimates<\/a>, I introduced the white paper by best-selling business author, Jerry Manas, titled <em><a title=\"White Paper: Bigger Than a Breadbox: 10 Tips for Better Project Estimates -- Part I\" href=\"https:\/\/go.planview.com\/better-project-estimates-takeaways\/\">Bigger Than a Breadbox: 10 Tips for Better Project Estimates &#8212; Part I<\/a><\/em>, which outlines five out of 10 suggestions project managers should consider when estimating projects. Effective estimating drives project success, better resource planning, and portfolio alignment. Without it, <a href=\"https:\/\/blog.planview.com\/fostering-collaborative-work-with-virtual-project-management-software\/\">impacts can extend far beyond the task or project<\/a> and can affect the entire portfolio, resulting in misuse of organizational resources. <!--more-->As a quick recap, Part I outlines helpful tips around:<\/p>\n<ol>\n<li>Estimation methods and timing considerations <em>(Accuracy versus timing)<\/em><\/li>\n<li><img loading=\"lazy\" decoding=\"async\" style=\"float: right; margin-left: 20px; margin-bottom: 15px;\" title=\"Bigger Than a Breadbox: 10 Tips for Better Project Estimates\" src=\"\/wp-content\/uploads\/2014\/01\/better-project-estimates-170x1701.jpg\" alt=\"Bigger Than a Breadbox: 10 Tips for Better Project Estimates\" width=\"170\" height=\"170\" \/>Addressing risk during planning <em>(Managing uncertainty &#8212; traditional and agile approaches)<\/em><\/li>\n<li>Estimating mega-projects <em>(Capital considerations)<\/em><\/li>\n<li>Special considerations for Agile <em>(Different methodologies to employ in creating estimates)<\/em><\/li>\n<li>Resource management issues <em>(Contributor estimates, earned value, and earned schedule)<\/em><\/li>\n<\/ol>\n<p>The latest white paper rounds out tips 6 through 10:<\/p>\n<ol start=\"6\">\n<li>Planning for resources <em>(Ensure resource availability)<\/em><\/li>\n<li>Estimates that mitigate risk <em>(Include management reserve and contingency reserve)<\/em><\/li>\n<li>The mega-project <em>(Have a separate project for estimating mega-projects)<\/em><\/li>\n<li>Using multi-point estimates <em>(Consider multi-point estimates based on risk)<\/em><\/li>\n<li>When bad things happen anyway (and they do) <em>(Don&#8217;t forget the other reasons projects are late)<\/em><\/li>\n<\/ol>\n<p>I encourage you to read both Part I and Part II to determine where your organization can make improvements. Get your copy of <a title=\"White Paper: Bigger Than a Breadbox: 10 Tips for Better Project Estimates -- Part II\" href=\"https:\/\/go.planview.com\/better-project-estimates-planning\/\"><em>Bigger Than a Breadbox: 10 Tips for Better Project Estimates &#8212; Part II<\/em><\/a> and access a complete summary of tips on page 6.<\/p>\n<p>I&#8217;d like to hear from you! After reading the papers and\/or summary, let me know if the tips were helpful or if you have any tips of your own to share with your peers.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In my blog post, 10 Tips for Better Project Estimates, I introduced the white paper by best-selling business author, Jerry Manas, titled Bigger Than a Breadbox: 10 Tips for Better Project Estimates &#8212; Part I, which outlines five out of 10 suggestions project managers should consider when estimating projects. Effective estimating drives project success, better&#8230;<\/p>\n","protected":false},"author":28,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_editorskit_title_hidden":false,"_editorskit_reading_time":0,"_editorskit_is_block_options_detached":false,"_editorskit_block_options_position":"{}","footnotes":""},"categories":[35],"tags":[412],"class_list":["post-6","post","type-post","status-publish","format-standard","hentry","category-pmo-project-management-organizations","tag-white-paper"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tips for Better Project Estimates - Project Management Blog | Planview<\/title>\n<meta name=\"description\" content=\"Read Part I and Part II of Bigger than a Breadbox: 10 Tips for Better Project Estimates to determine where your organization can make improvements.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/blog.planview.com\/tips-better-project-estimates\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tips 6-10 for Better Project Estimates\" \/>\n<meta property=\"og:description\" content=\"Read Part I and Part II of Bigger than a Breadbox: 10 Tips for Better Project Estimates to determine where your organization can make improvements.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/blog.planview.com\/tips-better-project-estimates\/\" \/>\n<meta property=\"og:site_name\" content=\"Planview Blog\" \/>\n<meta property=\"article:publisher\" content=\"http:\/\/www.facebook.com\/pages\/Planview-Inc\/89422974772\" \/>\n<meta property=\"article:published_time\" content=\"2014-01-07T16:13:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-12-14T21:13:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/blog.planview.com\/wp-content\/uploads\/2014\/01\/better-project-estimates-170x1701.jpg\" \/>\n<meta name=\"author\" content=\"Martha Garcia\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PPMmartha\" \/>\n<meta name=\"twitter:site\" content=\"@Planview\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Martha Garcia\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/blog.planview.com\\\/tips-better-project-estimates\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blog.planview.com\\\/tips-better-project-estimates\\\/\"},\"author\":{\"name\":\"Martha Garcia\",\"@id\":\"https:\\\/\\\/blog.planview.com\\\/#\\\/schema\\\/person\\\/8e41eb40e331dc1c5af7e008795309f4\"},\"headline\":\"Tips 6-10 for Better Project Estimates\",\"datePublished\":\"2014-01-07T16:13:21+00:00\",\"dateModified\":\"2017-12-14T21:13:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/blog.planview.com\\\/tips-better-project-estimates\\\/\"},\"wordCount\":277,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/blog.planview.com\\\/#organization\"},\"keywords\":[\"White Paper\"],\"articleSection\":[\"Project Portfolio Management\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/blog.planview.com\\\/tips-better-project-estimates\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/blog.planview.com\\\/tips-better-project-estimates\\\/\",\"url\":\"https:\\\/\\\/blog.planview.com\\\/tips-better-project-estimates\\\/\",\"name\":\"Tips for Better Project Estimates - Project Management Blog | Planview\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blog.planview.com\\\/#website\"},\"datePublished\":\"2014-01-07T16:13:21+00:00\",\"dateModified\":\"2017-12-14T21:13:47+00:00\",\"description\":\"Read Part I and Part II of Bigger than a Breadbox: 10 Tips for Better Project Estimates to determine where your organization can make improvements.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/blog.planview.com\\\/tips-better-project-estimates\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/blog.planview.com\\\/tips-better-project-estimates\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/blog.planview.com\\\/tips-better-project-estimates\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/blog.planview.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tips 6-10 for Better Project Estimates\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/blog.planview.com\\\/#website\",\"url\":\"https:\\\/\\\/blog.planview.com\\\/\",\"name\":\"Planview Blog\",\"description\":\"Leading the conversation on digital connected work\",\"publisher\":{\"@id\":\"https:\\\/\\\/blog.planview.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/blog.planview.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/blog.planview.com\\\/#organization\",\"name\":\"Planview\",\"url\":\"https:\\\/\\\/blog.planview.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/blog.planview.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/blog.planview.com\\\/wp-content\\\/uploads\\\/2015\\\/06\\\/planview-logo-black.png\",\"contentUrl\":\"https:\\\/\\\/blog.planview.com\\\/wp-content\\\/uploads\\\/2015\\\/06\\\/planview-logo-black.png\",\"width\":280,\"height\":66,\"caption\":\"Planview\"},\"image\":{\"@id\":\"https:\\\/\\\/blog.planview.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"http:\\\/\\\/www.facebook.com\\\/pages\\\/Planview-Inc\\\/89422974772\",\"https:\\\/\\\/x.com\\\/Planview\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/blog.planview.com\\\/#\\\/schema\\\/person\\\/8e41eb40e331dc1c5af7e008795309f4\",\"name\":\"Martha Garcia\",\"description\":\"Martha Garcia graduated from The University of Texas at Austin with a BS in Communication Studies. It was here that she developed an interest in corporate communication, specifically in the areas of change management within complex organizations as well as leadership and organizational behavior. Martha is responsible for working closely with thought leaders in the areas of IT and the PMO to develop compelling programs and content including informative webcasts and white papers for the IT PMO community.\",\"sameAs\":[\"https:\\\/\\\/x.com\\\/PPMmartha\"],\"url\":\"https:\\\/\\\/blog.planview.com\\\/author\\\/martha-garcia\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tips for Better Project Estimates - Project Management Blog | Planview","description":"Read Part I and Part II of Bigger than a Breadbox: 10 Tips for Better Project Estimates to determine where your organization can make improvements.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/blog.planview.com\/tips-better-project-estimates\/","og_locale":"en_US","og_type":"article","og_title":"Tips 6-10 for Better Project Estimates","og_description":"Read Part I and Part II of Bigger than a Breadbox: 10 Tips for Better Project Estimates to determine where your organization can make improvements.","og_url":"https:\/\/blog.planview.com\/tips-better-project-estimates\/","og_site_name":"Planview Blog","article_publisher":"http:\/\/www.facebook.com\/pages\/Planview-Inc\/89422974772","article_published_time":"2014-01-07T16:13:21+00:00","article_modified_time":"2017-12-14T21:13:47+00:00","og_image":[{"url":"https:\/\/blog.planview.com\/wp-content\/uploads\/2014\/01\/better-project-estimates-170x1701.jpg","type":"","width":"","height":""}],"author":"Martha Garcia","twitter_card":"summary_large_image","twitter_creator":"@PPMmartha","twitter_site":"@Planview","twitter_misc":{"Written by":"Martha Garcia","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/blog.planview.com\/tips-better-project-estimates\/#article","isPartOf":{"@id":"https:\/\/blog.planview.com\/tips-better-project-estimates\/"},"author":{"name":"Martha Garcia","@id":"https:\/\/blog.planview.com\/#\/schema\/person\/8e41eb40e331dc1c5af7e008795309f4"},"headline":"Tips 6-10 for Better Project Estimates","datePublished":"2014-01-07T16:13:21+00:00","dateModified":"2017-12-14T21:13:47+00:00","mainEntityOfPage":{"@id":"https:\/\/blog.planview.com\/tips-better-project-estimates\/"},"wordCount":277,"commentCount":0,"publisher":{"@id":"https:\/\/blog.planview.com\/#organization"},"keywords":["White Paper"],"articleSection":["Project Portfolio Management"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/blog.planview.com\/tips-better-project-estimates\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/blog.planview.com\/tips-better-project-estimates\/","url":"https:\/\/blog.planview.com\/tips-better-project-estimates\/","name":"Tips for Better Project Estimates - Project Management Blog | Planview","isPartOf":{"@id":"https:\/\/blog.planview.com\/#website"},"datePublished":"2014-01-07T16:13:21+00:00","dateModified":"2017-12-14T21:13:47+00:00","description":"Read Part I and Part II of Bigger than a Breadbox: 10 Tips for Better Project Estimates to determine where your organization can make improvements.","breadcrumb":{"@id":"https:\/\/blog.planview.com\/tips-better-project-estimates\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/blog.planview.com\/tips-better-project-estimates\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/blog.planview.com\/tips-better-project-estimates\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/blog.planview.com\/"},{"@type":"ListItem","position":2,"name":"Tips 6-10 for Better Project Estimates"}]},{"@type":"WebSite","@id":"https:\/\/blog.planview.com\/#website","url":"https:\/\/blog.planview.com\/","name":"Planview Blog","description":"Leading the conversation on digital connected work","publisher":{"@id":"https:\/\/blog.planview.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/blog.planview.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/blog.planview.com\/#organization","name":"Planview","url":"https:\/\/blog.planview.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/blog.planview.com\/#\/schema\/logo\/image\/","url":"https:\/\/blog.planview.com\/wp-content\/uploads\/2015\/06\/planview-logo-black.png","contentUrl":"https:\/\/blog.planview.com\/wp-content\/uploads\/2015\/06\/planview-logo-black.png","width":280,"height":66,"caption":"Planview"},"image":{"@id":"https:\/\/blog.planview.com\/#\/schema\/logo\/image\/"},"sameAs":["http:\/\/www.facebook.com\/pages\/Planview-Inc\/89422974772","https:\/\/x.com\/Planview"]},{"@type":"Person","@id":"https:\/\/blog.planview.com\/#\/schema\/person\/8e41eb40e331dc1c5af7e008795309f4","name":"Martha Garcia","description":"Martha Garcia graduated from The University of Texas at Austin with a BS in Communication Studies. It was here that she developed an interest in corporate communication, specifically in the areas of change management within complex organizations as well as leadership and organizational behavior. Martha is responsible for working closely with thought leaders in the areas of IT and the PMO to develop compelling programs and content including informative webcasts and white papers for the IT PMO community.","sameAs":["https:\/\/x.com\/PPMmartha"],"url":"https:\/\/blog.planview.com\/author\/martha-garcia\/"}]}},"_links":{"self":[{"href":"https:\/\/blog.planview.com\/wp-json\/wp\/v2\/posts\/6","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.planview.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blog.planview.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blog.planview.com\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.planview.com\/wp-json\/wp\/v2\/comments?post=6"}],"version-history":[{"count":0,"href":"https:\/\/blog.planview.com\/wp-json\/wp\/v2\/posts\/6\/revisions"}],"wp:attachment":[{"href":"https:\/\/blog.planview.com\/wp-json\/wp\/v2\/media?parent=6"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blog.planview.com\/wp-json\/wp\/v2\/categories?post=6"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blog.planview.com\/wp-json\/wp\/v2\/tags?post=6"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}